PROJECT PROFILE SUMMARY

ClientΒ 
GraΓ±a Y Montero Sedgman Joint Venture (GSJV)

Owner
Guyana Goldfields Inc. (GGI)

Project
Aurora Gold Mine Project

Scope:Β Construction of Mineral Processing PlantΒ 
Troy

  • Erection of three (3)-Β  26’ – 3” diameter x 29’ – 3” high Detox Tank
  • Erection of seven (7) 29’ – 6” diameter x 32’– 0” high Leach Tanks

GSJV

  • Erection of two (2) 43’ – 9” dia x 43’ – 3” high Leach Tank
  • Erection of six (6) 32’ – 4” dia x 37’ – 7” high Absorption Tanks

Variation

  • Erection of two (2). 27’ dia x 32’ high Detox Tanks
  • Erection of one (1) 43’ dia x 38’ high Process Water Tank
  • Erection of one (1) 33’ dia x 48’ high Diesel Tank

Execution Period
2011-2016