Managefy version 1.4.5
CASSIA ALPHA TO BRAVO BRIDGE/CASSIA FLARE BOOM
December 15, 2016
HIBISCUS 3C PROJECT (Pig Launcher and Pig Receiver and Deck Extension)
December 18, 2016

PROJECT PROFILE SUMMARY

Client
BP Trinidad & Tobago

Project
Bombax Manifold and Structure

Scope

  • Fabrication and assembly
  • Material procurement
  • Shop Fabrication of Bombax structural components and piping
  • Fabrication of Bombax structure and piping manifold
  • Abrasive blasting and coating
  • Pressure testing
  • Field assembly of structural and piping manifold at waterfront in preparation for load out
  • Quality Control
  • Non destructive examinations
  • Load out to quay side

Contract Value
USD$2.1million

Execution Period
October 2001-August 2002

Total Man-hours
108,794

Weight
420 tons