Client
Graña Y Montero Sedgman Joint Venture (GSJV)
Owner
Guyana Goldfields Inc. (GGI)
Project
Aurora Gold Mine Project
Scope: Construction of Mineral Processing Plant
Troy
- Erection of three (3)- 26’ – 3” diameter x 29’ – 3” high Detox Tank
- Erection of seven (7) 29’ – 6” diameter x 32’– 0” high Leach Tanks
GSJV
- Erection of two (2) 43’ – 9” dia x 43’ – 3” high Leach Tank
- Erection of six (6) 32’ – 4” dia x 37’ – 7” high Absorption Tanks
Variation
- Erection of two (2). 27’ dia x 32’ high Detox Tanks
- Erection of one (1) 43’ dia x 38’ high Process Water Tank
- Erection of one (1) 33’ dia x 48’ high Diesel Tank
Execution Period
2011-2016