OUR EXPERIENCE

Client description/year value
million us$
Thousand man-hour man-hours
Bechtel international petrotrin 16” dia. submarine pipeline – 2011 usd 6.1 53.6 53,648
Bechtel international installation of mechanical equipment and pipin erection train 4 – 2006 usd 53.4 3200.0 3.200.000
Bechtel international installation of mechanical equipment and pipin erection train 2 & 3 – 2001 usd 51.3 2500.0 2.500.000
Bechtel international installation of mechanical equipment and pipin erection train 1 – 1998 usd 14.5 1500.0 1.500.000
british gas tank design, manufacture & field erection – 2005 usd 1.4 39.9 39.914
british gas hibiscus platform 3c – 2008 usd 1.3 25.8 25.809
eisenbau essen 720 mw combine cycle power plant, structural steel & equipment installation, piping
prefabrication and erection – in progress
usd 102.0 4900.6 4.900.600
ethyl-chem 8” and 14” submarine pipelines – 2008 usd 9.1 21.9 21.854
lexicon inc./ customs metal furnace erection – nu iron plant fabrication and erectionof six (6) silos-
nu iron plant – 2006
usd 5.4 194.4 194.414
national gas company of
trinidad and tobago
fuel storage tanks (17), epc contract – 15 completed 2011
(2) awaiting for the client to build foundation
usd 11.6 156.3 156.262
national gas company of
trinidad and tobago
fabrication and installation of slug catcher, piping
and equipment installation – 2006
usd 15.5 550.0 550.000
petroleum company of
trinidad and tobago
fccu turnaraound – 2007 usd 2.4 92.8 92.783
petroleum company of
trinidad and tobago
construction of four (4) water tanks – 2009 usd 4.9 137.8 137.761
petroleum company of
trinidad and tobago
warehousing project – 2009 usd 2.5 110.3 110.330
petroleum company of
trinidad and tobago
gop tanks – 99% completed (2001) usd 7.4 218.1 218.115
proman ag trinidad ltd m 5000 – fabrication of 2000 mt of carbon steel – 2005 usd 2.4 26.7 26.695
proman ag trinidad ltd air ducts – 2005 usd 1.0 26.7 26.695
proman ag trinidad ltd erection of forty two (41) tanks – 2009 usd 5.9 446.2 446.165
proman ag trinidad ltd fabrication cs and las piping and ducting – 2009 usd 4.0 4.7 4.720
pt. lisas nitrogen converter modification / air preheater – 2007 usd 5.0 42.8 42.480
repsol ypf teak platform piping compressors – 2008 usd 5.6 139.5 139.529
samsung petrotrin ccr plant – 2009 usd 9.0 491.5 491.503
techint six (6) storage tanks – 2009 usd 4.0 108.8 108.796
techint fabricate & erect piping for alky/acid plant – 2009 usd 22.0 1031.0 1030.953
techint equipment installation for alky/acid plant – 2009 usd 4.7 53.9 53.920
techint pipe supports – 2009 usd 1.6 42.2 42.203
ventech engineering inc. piping & equipment installation – 2008 usd 11.0 927.5 927.476
ventech engineering inc. reformer & piping smr plant – 2008 usd 3.9 96.7 96.685
world gtl gas to liquids plant – 2009 usd 16.0 393.1 393.149
Name of Customer Job Description & Location Number of Tanks Diameter (FT) Height (FT) Capacity (bbls) Total (bbls) Contract Value End Date
1 Proman AG Trinidad Limited Downstream AUM Tank Erection, Trinidad 42 164 57 215,000 912,540 USD5,800,183 Oct-09
2 Petroleum Company of Trinidad & Tobago Gasoline Optimization Program, Trinidad 6 114 40 73,000 226,300 USD5,695,011 Nov-09
3 Petroleum Company of Trinidad & Tobago Gasoline Optimization Program, Trinidad 3 114 44 80,000 236,000 USD7,352,451 Mar-11
4 Techint Argentina Gasoline Optimization Program, Trinidad 6 40 30 6,500 34,300 USD3,952,500 Oct-10
5 National Gas Company of Trinidad & Tobago Supply of Storage Tanks at Caroni, Piarco & Guayaguayara, Trinidad 16 98 48 55,000 373,600 USD11,632,500 Mar-11

“Technical innovative and cost effective solutions”

Customer Name Year of service / Length of contract Annual Contract value
Million TT$
Services provided The range of maintenance services included the following:
Various Clients 1980 – 2008
2008 – Present (DATSU)
Plant Turnaround Services
Atlantic LNG 1999 to Present (17 years) 15-35

Routine Maintenance & Turnarounds:

  • Shop Fabrication services
  • Piping and structural steel field engineering, fabrication and installation; plant fitting and mechanical installation
  • Scaffolding associated with welding and fabrication works
  • Storage Tank Repairs
  • Equipment rentals
PCS Nitrogen 1981 to Present
(>35 years)
15-25

Routine Maintenance & Turnarounds:

  • Mechanical Equipment Maintenance
  • Piping and structural steel field engineering, fabrication and installation; plant fitting and mechanical installation
  • Machine shop works
  • Scaffolding associated with welding and fabrication works
  • Storage Tank Repairs
E & P
Operators
1990 to Present
(26 years)
30 – 80 Turnarounds and routine maintenance

  • Piping and structural steel fabrication, welding and installation
  • Equipment Installation & Commissioning
  • Scaffolding and painting
  • Equipment rentals
Central Bank of Trinidad and Tobago 1983 to 2012 (30 years) 2.5

Facilities Maintenance Services

  • Plumbing services
  • Electrical installation and power Maintenance including UPS networks and standby / emergency generator
Ministry of Finance 2012 to Present (>3 years) 2.5
  • HVAC system, consisting of cooling towers, chillers and air handlers
  • Mechanical Equipment Maintenance